Technical resource

What to verify in a barrier-unit mock-up approval

Verify geometry, unfolding, connectors, liner position, identification and packing before approving a representative barrier-unit mock-up.

Representative welded-mesh barrier unit prepared for mock-up review
Representative welded-mesh barrier unit prepared for mock-up review

A mock-up is useful only when its configuration and approval record can be traced to the production order.

Confirm the represented configuration

Record dimensions, cell count, wire, aperture, coating, liner and connector references.

Review handling and interfaces

Check unfolding direction, connection points, labels and interaction with the approved site layout.

Close the approval record

List accepted items, corrections, photographs, approvers and the effective drawing revision before batch production.

← Back to resourcesPrepare an RFQ