Records to retain at installation handover

Keep approved layouts, delivery records, installation observations, changes and maintenance notes together at project handover.

Installed barrier arrangement prepared for handover documentation
Installed barrier arrangement prepared for handover documentation

A concise handover pack preserves decisions made during delivery and installation. It supports later inspection without presenting the supplier's product information as a substitute for site engineering records.

Keep approved and as-installed information

Retain the approved product drawings and record field changes, locations and responsible approvals in an identifiable format.

Link delivery and installation observations

Reference package marks, receiving checks and relevant installation photographs so observations can be traced to a location or unit.

State inspection and maintenance responsibilities

Document who will inspect the installed system, the planned frequency and the process for assessing damage or changed site conditions.